Summary Comments - 2/14/07Comments submitted to Raymond Schrader, Chairman of the Cohocton Town Planning Board, on February 14, 2007. Click here to view a copy of the actual letter. These comments should be considered supplementary to our original commentary to Sandor Fox, Former Chair of the Planning Board, in June 2006 in response to UPC Wind's original DEIS and the draft version of Local Law #2 that was before the Board at the time. Table of ContentsA) Inadequate protection from noise, infractions, loss B) Serious deficiencies in review and approval process C) Inappropriate regional siting
Comments on Lent/Pine Hill SDEIS
Comments on Town of Cohocton Local Law #2, 2006BackgroundIn January 2006, in response to overtures made by UPC Wind and in coordination with them but without significant publicity to or input from the community, the Cohocton Town Board passed Windmill Law #1. When this Law was challenged by an Article 78 action in May, the response of the Town Board was to withdraw the first Law and replace it with a new version, Local Law #2 (LL2), with legal guidance provided by the developer’s lawyer. The Town Board passed this second version in late 2006. Our Observations
A) LL2 was clearly written with the best interests of the developer in mind and remains inadequate to protect the interests of Town residents who live near potential turbine sites. This is true throughout the Law, but we will focus again on three areas - noise levels, remediation of infractions, and loss coverage. 1. Residential noise levels are limited in LL2 to windmill only noise of 50 dBA at non-project property lines (525' from the base of each tower) and windmill only noise of 45 dBA at existing residences located on non-project parcels (1500'). These limits are unreasonably high. They also unfairly encroach upon the boundaries of non-project parcels by allowing sound levels that would be unacceptable for dwellings, thus limiting future land use. In our June 2006 comments we referenced a
rigorous scientific study done in Sweden in 2002 that documented the annoyance produced by wind turbines in nearby residents at different sound levels. They noted, "The annoyance increased with increasing sound pressure levels exceeding 35 dBA. No respondent stated themselves 'very annoyed' at sound pressure levels below 32.5 dBA. At sound pressure levels in the range of 37.5 to 40.0 dBA, 20% were very annoyed, and above 40 dBA 36%." Recent experience at UPC Wind's first industrial installation in the continental United States at Mars Hill, Maine, has confirmed
serious noise disturbance in spite of sound measurements that apparently fall within UPC's guidelines, indicating a problem with the guidelines themselves.
Given that the wind in our area is strongest at night, we believe that 30-35 dBA should be the maximum permitted turbine noise level outside homes. And since the large turbines selected cannot be this quiet at 1,500 feet, a reasonable noise ordinance as suggested would require them to be placed farther away from residences, perhaps as much as 2,500 feet or more, rendering the proposed configuration of wind turbines in the current SDEIS completely unacceptable. 2. There are no provisions in Section 1170 for identifying who may declare authoritatively that an offense has occurred nor who will be responsible to pay a fine or correct an offense if the developer or any one of its successors declares bankruptcy. 3. In spite of our June 2006 recommendation, there continue to be no provisions within LL2 for the assessment, arbitration, or adjudication of legal actions that may result from landowners who have reason to believe that they have suffered losses in use, enjoyment, or resale value of their property. B) The process of approval
for LL2 was not commensurate with the size and scope of the project being
considered, nor does it appear to have taken previous Town zoning guidelines and
decisions into adequate account. Not surprisingly, it also bypassed the
recommendations we made in June 2006, as follows. 1.
We noted that landowners with property bordering on leased lands had not
been consulted or offered compensatory leases for the effect such a project will
have on them. There has been no further action on this observation. 2.
We recommended that projects of this magnitude and laws proposing such
sweeping changes in local zoning should always be made subject to a binding
referendum of the entire Town electorate prior to approval and suggested that
the Town Board rescind Local Law #1, defer any further decision in favor of the
plan, and reaffirm its confidence in democracy by placing the entire matter
before its citizens in last fall’s elections. This recommendation was ignored,
as was a Moratorium
petition signed by over 200 residents. 3.
The Town has a clearly defined and established set of zoning guidelines
that should have been reviewed thoroughly and taken into authoritative account.
This process was handled lightly in the Board’s haste to approve LL2. 4. We remain convinced that it was completely inappropriate for the Cohocton Town Board and Planning Board to be guided and represented by lawyers who were hired and paid for by the developer.
C) Local Law #2 assumes that it is in our community’s best interest to permit the construction of an industrial wind power plant in the Town. Our research continues to lead us to the opposite conclusion. We believe that the Western New York area, especially within and surrounding the Finger Lakes, is an inappropriate site for wind farm development for several reasons: 1. In contrast to offshore sites, the wind patterns in our region are less consistent in strength and are predictably strong primarily at night and in the winter, times when demand for electrical power and displacement of power generated by fossil fuel will be at its lowest. The supply and demand nature of the market may even render a portion of the wind power generated unusable on the grid. While an offshore wind turbine may be expected to produce a yield of marketable power during the daytime hours and summer cooling season of up to 40% of its rated capacity, a reasonable estimate for similar turbines mounted in the Finger Lakes region is closer to half of that and possibly even as low as 8-10% [for full GE reports, click here: Phase I, Phase II]. 2. Since the return investors and the Town (in the form of PILOT revenue) have been promised is based on the volume of electricity actually sold on the market, wind turbines in our region can be expected to significantly underproduce equivalent machines in more suitable locations, causing those who have placed their hopes in unrealistically optimistic performance estimates to be seriously disappointed. 3. In addition, New York’s Finger Lakes region is most noted for its natural attractiveness as a tourist destination and a place of recreation. Its lakes, hills, villages, working farms, vineyards, and scenic beauty are unparalleled in this area of the world. Many people, seeking respite from the noisy industrial and commercial clatter and clutter of our urban areas, have come and increasingly invested here because they’ve been drawn by the unspoiled tranquility of the land and the graciousness of its people. The last thing that this growing segment of citizens and landowners wants to witness is the viewscape and soundscape they have invested in overrun by a sprawling and noisy industrial development. 4. There is a unique set of climatic conditions in the Finger Lakes region that predisposes our area to unusual accumulations of ice during winter storms. Recent years have brought at least 2 devastating “ice storms” that have toppled thousands of mature trees and caused substantial and widespread damage. We believe that enormous wind towers, located on hilltops unsheltered from the wind, would be extremely vulnerable to dangerous and expensive failure during any future ice storm. Further research has only underscored this concern. 5. While wind power industrialization of our Town may produce a modest financial benefit for a small number of its landowners, another predictable result will be a significant reduction in the value of its recreational land. Over time, whatever tax gains the Town may receive from PILOT revenues will be more than offset by losses sustained by the drop in recreational and retirement property value. As a result of these and other observations we strongly believe that, while it may be in our community’s best interest to permit the construction of small windmills for the use of individual landowners, our region in general and our community in particular is not suitable for large industrial windmill installations. For your serious consideration, we have appended an alternate Windmill Law #2, modeled on one passed earlier this year by the Town of Malone, NY, that codifies this conclusion in legislative form.
Comments on the Lent/Pine Hill SDEISBackgroundThe Pine/Hill Supplemental Draft Environmental Impact Statement submitted for review is essentially a follow up of the "Phase I" DEIS originally submitted by UPC Wind in April 2006 and opened to public comment in May and June. Our ObservationsWhat is different in the SDEIS? There are many details that depart from the original DEIS, but the primary one has been an increase in the size, output, and noise of the turbines that are being proposed. Minor rearrangements of turbine position have also been identified and approximately 25 turbines in the original DEIS have either been "cancelled" or, much more likely, postponed to a still-unannounced "Phase III" proposal. A) There are many particulars in the voluminous SDEIS that can be singled out for critical analysis, but the primary take-home observation is that the entire document, for all of its apparently clinical neutrality, remains as remarkably and understandably self-serving and lop-sided in favor of the developer's perspective as was the DEIS that preceded it. That having been said, we would like to focus on the same three impact areas - viewscape, soundscape, and property value - that we addressed in our June 2006 commentary. 1.
Visual Impact or Viewscape. The DEIS reluctantly acknowledges that the
developer’s project may, in some observers’ eyes, have a negative visual
impact. In response to our concerns and the concerns of many other citizens, UPC
Wind did do the following: a.
Update the images in the SDEIS to simulate the taller Clipper units. They
also produced a set of simulations of towers in settings where they are beside
and around human structures like houses, barns, silos, and other buildings.
These have been posted
online (in Dutch
Hill DEIS reviewed below, however, not in the SDEIS) and are shocking enough
to make us wonder whether we would have gotten this far as a community if images
like these had been available a year ago. b.
Produce an animated
simulation of towers as they would look to passers-by from Route 390 (again posted
in the Dutch Hill DEIS). Apparently there are also some video simulations of
how the towers would look at night lit up with flashing aircraft warning lights,
but we haven’t been able to get these to work yet. c.
What remains to happen is the sponsorship of public meetings in which
more accurately representative depictions, as noted above, can be examined by
the general public, and then conduct a broad-based study asking people to vote
on whether they think the installation improves or degrades the viewscape. 2.
Auditory Impact or Soundscape. This subject has been discussed to some
degree in a previous section of this letter addressing Local Law #2. The SDEIS
revisits this question with an updated
report on noise by Hessler Associates (Appendix I). This new set of
documents, for all its apparent professionalism, only addresses the change in
turbine noise from the Gamesa 2.0 MW units in the original DEIS to the Clipper
2.5 MW units now being proposed. Even though these are at least 1 dB louder,
however, Mr. Hessler has managed to obscure the extra dB and still get the
bigger turbines into boundaries in LL2 where the Gamesa units just barely
“fit”. Significant scientific criticism was raised during last year’s
comment period about Mr. Hessler’s deeply-flawed background noise
measurements, but his new study does nothing to correct these errors: he merely
relies on the same faulty data. The result is another set of recommendations
that are at least 10 dB off in favor of the developer and at the expense of
neighbors who are being asked to endure the proposed intrusion. Richard
Bolton has recently submitted updated professional analyses of the noise problem
and Mr. Hessler’s SDEIS/DEIS
studies that I have reviewed carefully and endorse completely. 3.
The SDEIS contains an extensive paper (Appendix
L, by Cushman & Wakefield) addressing the subject of property values.
However, diminishment in the real property value of land and dwellings in the immediate
vicinity of wind turbines is still not addressed by this paper in any
quantitative way that relates to our specific real estate environment. Studies
in other areas are referenced in which widely aggregated property values are
looked at, but local realtors with an intimate knowledge of the dynamics of our
market have still not been consulted and polled. The focused and dramatically
negative effect on the holdings of neighboring landowners who purchased
recreational and retirement property for its peace, tranquility, and unspoiled
view has not been addressed at all.
Comments on the Dutch Hill DEISBackgroundThe Dutch Hill Draft Environmental Impact Statement (DEIS) submitted for review is the first full community presentation of what has been referred to as "Phase II" of the proposed Cohocton wind project and outlines plans to install 16 Clipper 2.5 MW turbine towers in the Dutch Hill area. These are in addition to the 36 units proposed in the SDEIS just reviewed but do not include the 25 "cancelled" turbines mentioned above that probably represent "Phase III" of a progressively evolving project. It is interesting to note that a Viewshed Analysis in the SDEIS (Figure 22) depicts three projects, Phase I (Lent/Pine Hill), Phase II (Dutch Hill), and Prattsburgh. The separation of these into separate EIS applications is a clear example of illicit segmentation. Our ObservationsThis DEIS is simply an expansion of the original UPC proposal, reworked to accommodate Clipper 2.5 MW turbines, and repackaged as a "stand-alone" project. The "separate" noise study done by Mr. Hessler contains the very same design flaws as the one he submitted as part of the SDEIS reviewed above. Interestingly, Mr. Hessler collected his background sound and wind speed data for Dutch Hill during the same time period in the fall of 2005 that he was collecting data for the Lent/Pine Hill project, again belying the notion that there are "two" projects here, not just one expanded project. Viewscape simulations in the Dutch Hill DEIS also include turbines in "both" projects. We may have twins, triplets, or even quadruplets here, but it is certainly one pregnancy and should legitimately be labeled and brought before SEQR as such. Therefore, the comments we have submitted in response to the Lent/Pine Hill SDEIS all apply equally to the Dutch Hill DEIS.
ConclusionIn conclusion, it is our conviction that Windmill Law #2
remains sincerely
misguided and should be
overturned by our Town Board or the courts and replaced by a law that protects the interests of Cohocton's citizens more carefully. Thank you very much for taking the time to review and consider our input. If you have any questions, please do not hesitate to contact us. We certify that the observations and opinions expressed here are entirely the result of our own independent research and not solicited or paid for by any outside entity. Sincerely yours, Bill and Susan Morehouse P.O. Box 122, Beechner Road Cohocton, NY 14826 E-mail: bill@cohoctonfree.com
Appendices: Local Law #2 and Proposed Alternate Letter to J. T. Watkins on Noise Levels, January 27, 2007
Previous Submission: Summary of Comments submitted to Sandor Fox, former Chairman of the Cohocton Town Planning Board, on June 5, 2006. A copy of our June letter is available here.
|